Recent projects

JH143 Shipyard Risk Scope – White Rabbit

JH143 Shipyard Risk Scope – White Rabbit

ONA recently provided JH143 Risk Assessment of Echo Yachts, for an underwriter. The scope covered the launch of the luxury motor vessel from the Echo Yachts yard in Henderson WA. ONA was able to draw on our past experience with such shipyard work in combination with our heavy lift and docking capabilities to offer truly […]

Read More
FPSO Positioning and Connect Operability

FPSO Positioning and Connect Operability

ONA Consultants has been contracted by an energy major to undertake marine operations engineering with a view to understand re-connect operability for an FPSO on the North West Shelf, Australia. The work scope included modelling and operability assessments of the FPSO on the connected internal APL turret and mooring system, under the influence of a […]

Read More
FPSO Static Tow and Operability Engineering Scope

FPSO Static Tow and Operability Engineering Scope

ONA Consultants has been contracted by an energy major to undertake position keeping engineering for an FPSO on the North West Shelf, Australia. The work scope included modelling and operability assessments of the FPSO on the connected turret and mooring system, under the influence of a multitude of probable sea states. ONA has developed robust […]

Read More
Greater Enfield Project Tow Consulting

Greater Enfield Project Tow Consulting

ONA were recently completed a tow consulting scope on the Woodside Greater Enfield Project on behalf of TechnipFMC. The scope comprised tow planning, procedures, stability, and tow load path engineering and verification of multiple voyages. Each tow formed part of the mobilisation of equipment and permanent materials from Singapore. Typically marine transportation scopes in the […]

Read More
Nearshore Construction Naval Architectural Support

Nearshore Construction Naval Architectural Support

ONA Consulting were recently awarded naval architectural support scope including stability verification for a nearshore marine contractor. The scope draws on our long experience supporting marine transportation and engineering scopes across Australia. ONA consultants provide a range of engineering and verification support services for marine tow contractors, heavy lift transportation and installation contractors. The scopes […]

Read More
ONA awarded FPSO Marine Engineering Scope

ONA awarded FPSO Marine Engineering Scope

ONA Consultants has been contracted by another major oil and gas operator to undertake an FPSO engineering scope that includes design, structural engineering, finite element analysis, marine operations and procedurisation. Given our strong engineering and operations skills base, this scope was particularly well aligned and the team was able to execute the scope to the […]

Read More
Navy Frigate Berthing Feasibility Study

Navy Frigate Berthing Feasibility Study

Scope The client engaged our team to conduct a mooring feasibility study for a defence contractor’s berth facility in Henderson, WA. The facility consists of a small concrete wharf, complemented with dolphin piles and a second berth consisting only of dolphin piles. The goal for the project: to semi-permanently moor these vessels and assess the […]

Read More
Umbilical Riser Analysis

Umbilical Riser Analysis

Scope The Kitan Field is located in the Timor sea, ~500 km off the Australian coast, and includes an FPSO facility. We undertook an umbilical riser dynamic analysis, as well as a fatigue analysis, on behalf of the installation contractor on the Kitan Field development. The umbilical riser was installed in a lazy wave configuration […]

Read More
Prelude FLNG Pile Mobilisation and Transportation

Prelude FLNG Pile Mobilisation and Transportation

Scope Our team was engaged to conduct a marine transportation study of the Prelude FLNG anchor piles on behalf of the installation contractor. The 16 piles, which are 5.5 m in diameter at 62 m long and weigh over 650 Te, are the heaviest in the world and were loaded out from a heavy lift […]

Read More
CALM Buoy Re-lifing

CALM Buoy Re-lifing

Scope The ONA team undertook an asset management challenge to ‘relife’ a CALM buoy and mooring system. The CALM buoy system was reaching the end of its design life and would fall out of class requirements. Our brief was to assess the condition of the CALM buoy system, from the topside components and hawser down […]

Read More
Mooring Feasibility Study of Aging Shiploader Berth

Mooring Feasibility Study of Aging Shiploader Berth

Scope At the request of the facility owner, the ONA team undertook a mooring feasibility study of a typical bulk carrier alongside an aging ship loading facility. The ship loading facility was constructed in the 1940s and consists of unique rectangular box beam dolphins and a non-conventional fendering system made of truck tyres. The feasibility […]

Read More
Prelude FLNG Position Keeping Analysis

Prelude FLNG Position Keeping Analysis

Scope Keen to tap into our extensive FPSO position keeping experience, the client engaged our team to provide consulting support to the installation contractor for the position keeping of the Prelude FLNG located in the Browse Basin, Australia – the largest floating facility ever built. Due to the location of the Browse Basin, the FLNG […]

Read More
Back to top arrow